SAV Information Collection Form for Green Energy
1. Project name(項目名稱)
2. Project location(項目所在地)
3. Project type(項目類型)
A- standby power(備電)
B- industrial and commercial energy storage (peak-valley arbitrage)(工商業(yè)儲能(峰谷套利))
C- new energy allocation and storage(新能源配儲)
D- grid side energy storage(電網(wǎng)側儲能)
4. Grid frequency(電網(wǎng)頻率)
50Hz
60Hz
5. Project scale(項目規(guī)模)
Single project scale (MW)(單個項目規(guī)模)
Total project scale (MW)(項目總計規(guī)模)
6. Environmental conditions(環(huán)境條件)
7. Required product certifications(產(chǎn)品認證)
CE certification
UL certification
ISO 9001
IEC standards compliance
Local regulatory certifications
Other
8. Energy storage management procedures(儲能管理規(guī)則)
9. Project acceptance process(驗收流程)
10. Project design documents(項目設計資料)
選擇文件
11. Preliminary and basic data(基礎數(shù)據(jù))
選擇文件
12. On-site network conditions(網(wǎng)絡狀況)
Excellent
Good
Fair
Poor
Not available
4G signal quality(4G信號是否良好)
Availability of external broadband access(是否可以提供外網(wǎng)寬帶)
Power Distribution
13. Incoming Voltage At Low Voltage Side Of Transformer And Grid Frequency (50HZ/60HZ)(變壓器低壓側進線電壓及電網(wǎng)頻率(50HZ/60HZ))
14. Capacity And Quantity Of Transformer(變壓器容量及數(shù)量)
15. Transformer Load Rate(變壓器負載率)
16. Frequency Of Power Grid Outage(電網(wǎng)停電的頻率)
Power Outages Per Day(每日停電次數(shù)):
Maximum Duration Per Outage(每次停電持續(xù)時間):
Power Outages Per Month(每月停電次數(shù)):
Customer Demand(客戶需求)
17. Need To Build (需要新建)
Photovoltaic(光伏)
Energy Storage(儲能)
Photovoltaic & Energy Storage(光伏+儲能)
18. Time Interval For Switching Important Loads To Standby Power Supply After Power Failure(電網(wǎng)停電后,重要負荷切換為備電供電的時間間隔)
20ms(20毫秒)
2min(2分鐘內)
Longer (specify time interval)(更長時間)
19. How Long Does It Take To Reserve Power For Energy Storage(儲能需要備電多長時間)
20. Other Requirements(其他要求)
Load Data
21.
List of Load Information for Backup Power Equipment
(備電設備負載信息清單)
選擇文件
Genset(發(fā)電機組)
22. Generator Set Type(發(fā)電機組類型)
Diesel Generator(柴油發(fā)電機)
Gas Generator(燃氣發(fā)電機)
Others(其它)
23. Main Power, Standby Power And Quantity Of Generator(發(fā)電機主用功率、備用功率及數(shù)量)
Main Power (kW)(主用功率):
Standby Power (kW)(備用功率):
Quantity(數(shù)量):
24. Provide Diesel Engine Technical Parameters, System Instructions And Electrical Diagrams(提供柴發(fā)技術參數(shù)、系統(tǒng)說明書、電氣圖)
選擇文件
25. Generator Start-Stop Data(發(fā)電機啟停數(shù)據(jù))
Generator Turned On Method(發(fā)電機開啟方式)
Seconds To Output Normal Voltage After Start(開啟后幾秒可以輸出正常電壓)
26. Switching Between Generator And Power Grid(發(fā)電機與電網(wǎng)切換情況)
Is The Generator And Power Grid Switched By ATS? (Yes/No)(發(fā)電機與電網(wǎng)是否為ATS切換)
Switching Time (seconds)(切換時間為幾秒):
Switching Mode(切換模式為手動還是自動)
27. Daily Operating Hours Of Generator After Power Failure(發(fā)電機日運行小時數(shù))
Daily Operating Hours(電網(wǎng)停電后,發(fā)電機每天運行幾個小時):
Generating Power (kW)(發(fā)電機發(fā)電功率):
28. Fuel Consumption(燃料消耗)
Fuel Consumption Per Hour(發(fā)電機1小時燃料消耗量):
Local Price Of 1L Diesel(當?shù)?1L 柴油價格):
Price Of 1m3 Cubic Meter Of Gas(1立方米燃氣價格):
Photovoltaics(光伏)
29. Enterprise's Existing Photovoltaic Situation(企業(yè)已有光伏情況)
Is Photovoltaic Installed? (Yes/No)(目前企業(yè)是否安裝有光伏)
Installed Photovoltaic Capacity (kW)(已安裝光伏的容量):
Photovoltaic Inverter Specification And Quantity(光伏逆變器規(guī)格及數(shù)量):
30. Planned New Photovoltaic Installation Capacity (kW)(計劃新安裝光伏容量)
31. Photovoltaic Field(光伏場地)
Site Size For Photovoltaic Installation(企業(yè)用來安裝光伏的場地尺寸):
Unit Area Load-Bearing Capacity Of Installation Site (Roof/Ground, etc.)(光伏安裝場地(屋頂或地面等)單位面積承重為多少?):
32. Provide Floor Plan, Architectural Drawings And Structural Drawings Marked With Bearing Data(
提供建筑圖、結構圖,圖中需標注承重數(shù)據(jù)
)
選擇文件
Others(其他)
33. Noise(噪音)
34. Incoming voltage level(進線電壓等級)
35. Incoming capacity(進線容量)
36. transformer capacity(變壓器容量)
37. Transformer load rate(變壓器負載率)
38. Relay Protection Parameters(繼電保護參數(shù))
Overload protection current (A)(過負荷保護電流)
Current transformer ratio(電流互感器變比)
Trip time (s)(跳閘時間)
Alarm time (s)(告警時間)
Transformer temperature alarm value (°C)(變壓器溫度告警值)
Overtemperature trip value (°C)(超溫跳閘值)
39. Load data file(負荷數(shù)據(jù))
選擇文件
40. Electrical primary wiring diagram(電氣一次接線圖)
選擇文件
41. Is photovoltaic installed?(是否已經(jīng)安裝了光伏?)
Yes(是)
No(否)
42. Existing PV design documents(現(xiàn)有的光伏設計文件)
選擇文件
43. Planned PV installation information(計劃的光伏安裝信息)
Planned installation capacity (kW)(計劃安裝容量)
Roof orientation(屋頂承重數(shù)據(jù))
Available installation area (m2)(可用安裝面積)
44.
Factory area general layout(光伏安裝廠區(qū)總平面圖
)
選擇文件
45.
Building roof structural diagram(光伏安裝建筑屋頂結構圖)
選擇文件
46.
Roof load-bearing data (kg/m2)(光伏安裝屋頂平面圖)
選擇文件
47.
orientations(光伏安裝朝向)
選擇文件
48. Electricity tariff information(電價)
On-peak period (time range)(尖峰時段)
On-peak tariff (currency/unit)(尖時段電價)
Peak period (time range)(高峰時段)
Peak tariff (currency/unit)(高峰時段電價)
Flat period (time range)(平時段)
Flat tariff (currency/unit)(平時段電價)
Valley period (time range)(谷時段)
Valley tariff (currency/unit)(谷時段電價)
49. Basic electricity fee payment method(基礎電費繳納方式)
Transformer capacity(變壓器容量)
Maximum demand(最大需量)
Other(其他)
50. Site and electrical images(場地和電氣圖)
選擇文件
51. Installed energy storage capacity(儲能裝機容量)
52. Energy storage grid-connection voltage level(儲能并網(wǎng)電壓等級)
0.4kV
10kV
22kV
35kV
110kV
53. Metering electric meter installation location(計量電表安裝位置)
Public power grid side (within power company property)(公共電網(wǎng)側(在電網(wǎng)公司產(chǎn)權范圍內))
User transformer high-voltage side (incoming line)(用戶變壓器高壓側(進線側))
User transformer low-voltage side (outgoing line, same bus as energy storage)(用戶變壓器低壓側(出線側,即與儲能系統(tǒng)同一母線))
Energy storage system output end (dedicated metering)(儲能系統(tǒng)出線端(專用計量))
54. Noise(噪音)
C-New Energy Allocation And Storage
55. Capacity of photovoltaic power station(光伏電站容量)
56. Voltage(電壓)
How much kV is the high voltage side of the photovoltaic power station?(光伏電站高壓側電壓為多少KV)
how much kV is the low voltage side of the photovoltaic power station?(低壓側電壓為多少kV?)
57. Energy storage use(儲能用途)
A-The grid does not allow photovoltaic residual electricity to access the Internet, and stores energy to recover photovoltaic residual electricity(電網(wǎng)不允許光伏余電上網(wǎng),儲能回收光伏余電)
B- power grid power failure leads to light abandonment, and energy storage recovers photovoltaic light abandonment loss(電網(wǎng)停電導致棄光,儲能回收光伏棄光損失)
58. Policy(政策)
59. Energy storage discharge time(儲能放電時間)
60. Electricity rate(電價)
Photovoltaic feed-in tariff(光伏上網(wǎng)電價)
Peak, peak, flat and valley periods and electricity prices of enterprises(企業(yè)尖、峰、平、谷各時段及電價)
Energy storage and discharge period electricity price(儲能放電時段電價)
61. Electrical wiring diagram of photovoltaic power station(光伏電站電氣接線圖)
選擇文件
62. Statistical table of power loss of photovoltaic power station, daily power loss(光伏電站損失電量統(tǒng)計表格,每日損失電量)
選擇文件
63. Daily photovoltaic power curve (kW) for each grid connection point(每個并網(wǎng)點,光伏日發(fā)電功率曲線(KW))
選擇文件
64. Energy storage grid-connected voltage level(儲能并網(wǎng)電壓等級(0.4kV/10kV/22kV/35kV/110kV))
0.4kV
10kV
22kV
35kV
110kV
65. Where should the metering electric meter be installed?(計量電表安裝位置)
On the public power grid side (within the property scope of the power company)(公共電網(wǎng)側(在電網(wǎng)公司產(chǎn)權范圍內))
On the high-voltage side of the user's transformer (incoming line side)(用戶變壓器高壓側(進線側))
On the low-voltage side of the user's transformer (outgoing line side, i.e., the same bus as the energy storage system)(用戶變壓器低壓側(出線側,即與儲能系統(tǒng)同一母線))
At the output end of the energy storage system (dedicated metering)(儲能系統(tǒng)出線端(專用計量))
66. Noise(噪音)
D-Grid Side Energy Storage
67. Planned grid connection level(計劃并網(wǎng)電網(wǎng)等級)
35kV
20kV
11kV
400V
Other
68. Capacity(容量)
Customer's planned installed energy storage capacity(客戶計劃儲能裝機容量)
the single project scale(___kW/___kWh)(單個項目規(guī)模)
total project scale(___kW/___kWh)(項目總計規(guī)模)
69. Communication protocol for energy storage access scheduling(儲能接入調度需要采用哪種通信規(guī)約)
Modbus
IEC 61850
DNP3
Other
70. Performance parameters required by dispatching for energy storage(調度對于儲能有哪些性能參數(shù)要求)
71. Location of energy storage grid connection point(儲能并網(wǎng)點位置)
Superior substation(上級變電所)
Enterprise internal(企業(yè)內部)
72. Project revenue sources(項目收入來源)
Peak-valley price difference(峰谷價差)
Power auxiliary services(電力輔助服務)
Government subsidies(政府補貼)
Other(其他)
73. Data such as the length and width of the project installation site.(項目安裝場地長度、寬度等數(shù)據(jù))
74. Site pictures reflecting terrain conditions(場地圖片,體現(xiàn)場地是否平整、平地、山地等)
選擇文件
75. Energy storage grid-connected voltage level(儲能并網(wǎng)電壓等級(0.4kV/10kV/22kV/35kV/110kV))
0.4kV
10kV
22kV
35kV
110kV
76. Where should the metering electric meter be installed?(計量電表安裝位置)
Public power grid side (within the property scope of the power company)(公共電網(wǎng)側(在電網(wǎng)公司產(chǎn)權范圍內))
High-voltage side of the user's transformer (incoming line side)(用戶變壓器高壓側(進線側))
Low-voltage side of the user's transformer (outgoing line side, i.e., the same bus as the energy storage system)(用戶變壓器低壓側(出線側,即與儲能系統(tǒng)同一母線))
Output end of the energy storage system (dedicated metering)(儲能系統(tǒng)出線端(專用計量))
77. Noise(噪音)
關閉
更多問卷
復制此問卷